Project Features and Completed Works
Initially, the facility was built with numerous violations, which led to the failure of the entire system. Our team took on the task of not just repairing the fountain, but completely eliminating all systemic shortcomings.
During the work, our team carried out a full range of restoration measures:
Damaged sections of supply pipelines and completely failed automation were identified and replaced.
We performed complete sealing of the caisson and fountain bowl, which is critically important for its durable and safe operation.
Our specialists assembled and programmed a new control cabinet. To prevent repeated breakdowns, we moved it from underground to the surface, ensuring reliable protection from moisture and ease of maintenance.
Drainage and emergency water pumping systems were installed, which were completely absent in the original project, eliminating the risk of flooding and equipment damage.
Currently, the facility is in the commissioning phase, and soon residents will be able to enjoy a new, safe and modern fountain, created with all necessary standards in mind.
Photographic Materials of Urban Pedestrian Fountain Modernization
Installation of Bowl and Hydraulic Equipment
Installation of sealed bowl and mounting of complex system of pumps, nozzles and communications
Installation of Decorative Grating
Installation of durable metal grating for safe movement across the fountain
Adjacent Territory Improvement
Laying of paving stones and improvement of the area around the fountain
Fountain Control System
Installation of high-tech programmable controller for water jet management
Commissioning and Testing
Testing of all fountain systems to ensure uninterrupted operation
Summary of Completed Works
Our team carried out a full range of restoration and modernization works on the fountain facility, including diagnostics, repair, waterproofing and implementation of modern control systems.
Completed Works:
Damaged sections of supply pipelines and completely failed automation were identified and replaced
Complete sealing of the caisson and fountain bowl was performed to ensure durable and safe operation
New control system was assembled and programmed with control cabinet moved to surface for moisture protection
Drainage and emergency water pumping systems were installed, eliminating the risk of equipment flooding
Installation of sealed bowl and mounting of complex system of pumps, nozzles and communications
Result: The facility is in the commissioning phase. Soon residents will be able to enjoy a new, safe and modern fountain, created with all necessary standards and safety requirements in mind.